Friday, October 10, 2008

Director Rho

Rhoan made this adorable video slideshow of the new crib....he's so creative!

http://www.youtube.com/v/VlBrGx2AWic

Tuesday, September 30, 2008

More Done Than Not

Okay so the good news is that we have a certificate of occupancy. The bad news is that it isn't exactly 100%. More like 97.6% finished. I'm okay with that. Moving in anyway.










Friday, September 19, 2008

7 Days...

Okay, with 7 days left, here's the latest:

Side walk installed and grass seeded...


Master closet ready for clothes... AND SHOES!





Kitchen tile up and shinining



Shower and tub are tiled...




Vanities are set... and fixtures installed

Saturday, September 13, 2008

The Finish Line!

I have been promised to have a c.o. by next Friday...We'll see.
Here's the progress:

FRONT PORCH

Front (left) and Back Porch (right)

The Piece de Resistance! Foyer Light!



LIVING ROOM
MASTER BATH

Tub Tile...looking good!

Monday, September 1, 2008

Floors are Final!

Floors, Floors, Floors... (Dusty but done)


ENTRY HALLWAY

UPSTAIRS HALL & MASTER CLOSET

UPSTAIRS HALL

LIVING ROOM (Note the hot light!)


MASTER BEDROOM

KITCHEN



FAMILY ROOM



KITCHEN


KITCHEN


KITCHEN

MASTER BATH


HALL BATH








Friday, August 22, 2008

Riding the Rails



FRONT OF THE HOUSE



BACK PORCH




FRONT RAILS



FRONT PORCH







INSIDE STAIR RAILS AND BOX NEWELS